AC Lopez Construction, Inc.
ABOUT US
AC Lopez Construction, Inc serves as a leading government construction company in the Southwestern region of the United States. We’re a team of fully-certified professionals who tackle everything from complex large design build projects to smaller scale jobs. Fueled by our commitment to excellence and partnership approach we go the extra mile to make sure our clients are completely satisfied.
As federal contractors we believe we have a duty not only to the agencies we work with but also to the American people to provide cost effective solutions. AC Lopez Construction has a documented history of value engineering projects in order to provide the most value to it's customers.
Federal Certifications
8 (a)
Certified in 2022, AC Lopez Construction is currently a participant in the 8(a) Business Development program, qualifying as eligible to compete for the program's sole-source and competitive set aside contracts. The government authorizes sole-source contracts to 8(a) participants up to 4.5 million without going through the formal justification process.
HUBZone
Certified since 2015, AC Lopez Constructions has participated in the HUBZone program assisting the federal government in fueling small business growth in historically underutilized business zones.
Women Owned Small Business
Certified since 2015, AC Lopez Construction joined the WOSB Federal Contracting program making our company eligible to compete for federal contracts reserved for the program's certified participants.
Services NAICS Codes: 236220, 238910, 237990,238990, 237310, 237110
Securtiy
ATFP
Entry Control Point
CCTV /Access Control
High Secerity Fencing
U/G Utilities
Storm Drains
Sanitary Sewer
Water
Electrical
Gas
General Contracting
Ground Up
Tenant Improvement
Repairs & Alterations
Sustainable Construction
Infastruture
Roads
Bridges
Canals
Airfields
Communication
Site Work
Earthwork
Demolition
Fencing and Gates
Concrete and Masonry
Past Performance
Some of Our Latest Work
Pave Access Road and Parking Lot
United States Army Corps of Engineers
Location: Calexico, CA
Dollar Value: $3,155,367.00
Description: The project scope consists of constructing a ½ mile two lane road and 3.5 acre secure parking lot as well as associated utility infrastructure at the Calexico Border Patrol Station. The 6 plus acre project site was mass excavated from 24” to 36” in depth totaling over 20,000 cubic yards. The scope also involved installation of 1,500 LF of security fencing with razor ribbon, construction of a new trash enclosure and 1,400 LF class 3 rip-rap lined site drainage swale.
CA002 Warehouse, Repair Interior
US Amry, Mission & Installation Contracting Command
Location: Patton Hall Army Reserve Center, Bell CA 90201
Dollar Value: $1,914,511.00
Description: AC Lopez Construction, Inc. was contracted to design-build a Parachute Rigging and Storage Facility at the Patton Hall US Army Reserve Center in Bell, CA. The project involved the conversion and renovation of the east half of the existing B-331 warehouse into a 31,482 square foot parachute rigging, packing, and storage facility complete with new HVAC and humidity control system, electrical power, lighting, telecom, access control and CCTV security system, fire alarm system, fire sprinkler retrofit, security doors, motorized roll-up doors, insulation, finishes, and a secure ceiling system. The renovated space included three (3) new rooms with 18’ high metal stud and gypsum board walls reinforced with structural supports and a 6-gauge wire mesh secure lid.
City Creek Road Stabilization
USDA, Forest Service
Location: Forest System Road 1N09, San Bernardino National Forest CA
Dollar Value: $768,740.50
Description: AC Lopez Construction Inc. was contract by the USDA Forest service to perform the following services. Reconditioning the existing road which including the laying down of 9,075 tons of untreated aggregate surface course. Reestablished 95 rolling dips, 38 lead-offs, removal of sloughs and reestablish drainage features in 57 over side drains. Additionally, the project consisted of installation of 6 new overside drains and installation of 7 new rolling dips. Other features of work included survey and staking, contractor testing, soil erosion & pollution control, and temporary traffic controls.